Random thoughts from daily life

Saturday, November 07, 2009

Project Day

I'm not sure if you've heard yet (or maybe you witnessed it), but it snowed the other day. Enough that the ground was covered, and several days later, you can still find some in selective spots. Something about realizing winter is close at hand puts me in this mood that we need to get projects done. It must be the impending cold, and realizing there won't be any more setting up saw horses in the driveway, or hanging around in the garage working with tools because you will freeze.

So, that is why today, I decided I needed to do projects, and we've had our list for months, so there were plenty to do (Troy had his own list). Of course, I thought we could do them all in a single day. I didn't just start with one and see where we got with it, but I started them all. No joke, people, I took out stuff for all of the projects we want to do, and moved from room to room, doing a little on each. It made no sense, and you would think with my love for organization, that this would drive me crazy. Well, it does! (My brain isn't as organized as other aspects of my life I guess. It is spastic and runs a mile a minute and wants to do it all!)

Although we did get some things accomplished today, none of the projects are completely done, and instead, there are messes all over the house. Here are examples of what I mean.


Filling nail holes on the trim Grampa installed in the boys room.

Fixing our wooden desk chair, which hasn't worked right since the day I bought it.



I think I have figured out what was wrong with it though.


Working on built-ins for the boys room.



They will need to be trimmed out, doors made, and then a window seat made for that gap you see to the right. Them more puttying, priming, painting, etc. Not sure if the boys are ever going to move back in this room.


Scraping old paint off the upstairs bathroom walls, as well as the metal shower.



Hopefully both will be sealed with a special primer for bathrooms, and then painted. There is no ventilation up there so we have a little bit of a molding problem (I think I detect another project in that comment).


Getting ready to prime the dining room walls.


My brother in law Derf wants to do some Venetian plaster technique in there, but in the meantime, I am sick of looking at those walls. I am going to put some temporary paint up.

Rearranging the den.


I hated seeing the HUGE black armoire the tv etc. was in when walking into the room (that whole Feng Shui thing), so moved everything around until I found something that sort of works. Now I am contemplating curtains or window shades, a lamp in the corner, and of course didn't find anything I liked when we went shopping tonight. One never wants to spend a fortune on decor when they still have ugly wallpaper donning the room :-)

Building the magnet/chalkboard in the kitchen.


I started that 2 months ago, and only had the steel on the wall, and finally got the chalkboard paint and the frame up. Now I need to putty it and paint it!

Staining the counter top for the new cabinet that my dad made awhile back and installed recently.



This project will take about a week to complete, as there are 8 coats of stain and tongue oil that need to go on it (of course sanded between each coat.......if I've learned nothing else from my Dad working with him all these years it's that). I am only on day 3.

Polishing the oak floors.


This project came about by accident. When I was cleaning the new table in the dining room last week, I tried out this random can of stuff I had from when we moved, that the staging lady had told me to use on the cabinets. The rag I used was left on the floor, and when I picked it up, the floor had a lovely sheen to it in that spot. I started dumping more, and was amazed at what it did. A week later, it still looks great, and I have done two other rooms, with intent to do the rest of the house. We tried to do something like this to the floors last Christmas with a product we had purchased, but it was really expensive, didn't cover well, and seemed to dissipate after a day. Scott's liquid gold is the way to go: $5 a can, covers more than one room per can, and smells like almonds to boot!

Do you feel overwhelmed! This list doesn't include the fixing of the chimney, or the loading, unloading and stacking of the firewood (we are going to try the barn this year as last year the stuff in the basement grew mold because it was too damp down there.)

2 comments:

coco said...

wow. you are insane. i definitely do the same thing with chores, though, tam. i start one thing and then before i know it, that one project has led me to 7 more. but since i don't have any projects that require me to BUILD anything, i'm usually able to get them all done in a weekend's time. good luck, the place is looking beautious!

gina said...

can't wait to see all the progress. everything is looking great. LOVE the chalkboard!

Blog Archive

Search